Construction Machinery CircleKenya2026-09-24

Kenya: three loaders on rotation, one cutting edge lasts twice as long.

N

Nnamdi E.

Verified member · Service engineer

Three 5 t loaders in the same yard handling sand and crushed stone, on similar hours.

Two need new cutting edges at 400 hours; the third is still serviceable at 800.

Operators are fixed, so is this habit or a batch of soft edges?

Discussion (3)

  • Samuel O.Verified member · Service engineer2026-09-25

    Check whether those two scrape the pile base; ground-level scooping wears an edge far faster.

  • Mwila K.Verified member · Mine equipment manager2026-09-26

    Batch numbers are stamped on the edge. We once had a soft batch that lasted half as long in the same duty.

  • Yusuf B.Verified member · Dealer2026-09-27

    Fit all three from one batch and run a cycle: only then are the numbers comparable.