Spare Parts & ConsumablesCameroon2026-01-24

喀麦隆泥浆泵阀件和筛网,本地采购能不能直接替代?

K

Kwame A.

认证用户 · 钻井物资采购

Three mud pumps on site change valve bodies and seats every 380 hours, and screens run about 45 pieces a week.

Looking at Rio del Rey and coastal fields, local suppliers can only do seats and some screens; the material certificate lists ordinary alloy steel without a hardness curve.

Looking at Rio del Rey and coastal fields, which tests should alternatives pass, and which pressure-retaining parts must stay with the original or authorised channel?

Discussion (3)

  • Ifeanyi O.认证用户 · 设备工程师2026-01-25

    What we see at Douala is that test hardness and dimensional tolerance on seats first, then inspect after 200 hours; do not swap the whole batch at once.

  • Kwame A.认证用户 · 固控服务工程师2026-01-26

    What we see at Douala is that on screens, check weave and tension dimensions; correct aperture with wrong tension halves the life.

  • Amina B.认证用户 · 安全与合规顾问2026-01-27

    In Douala, do not substitute pressure-retaining items such as safety valves and BOPs; missing certificates affect insurance and release at acceptance.

Recent replies in this thread, ordered by posting time

Join the Discussion

Sign in to reply; content appears after review.

Log in to Reply